Inspection register template: what a template has to contain

An empty template is worth only what it forces you to write. Here are the fields, the obligations to write into them, and where to read the source.

Every value quoted here is read from the same sourced rules that prepare the registers. Nothing on this page is reworded.

The fields of an entry

Four, and they are enough. They are the ones a tigidu register keeps.

The dateThe day the work was done. Never the day it was written down.
The obligationWhich of the tracked obligations this work satisfies, named the way the rule names it.
Who did itThe person or company that performed the work, as they sign their own record.
The evidenceA dated service record, handed over by whoever performed the work. That is the document filed in the register, under this obligation.

No example date is written on this page. A register is filled with what actually happened in your building, and a specimen padded with invented dates would be the exact opposite of what we keep.

The official source

The regulation is published by the Régie du bâtiment du Québec and their page is free. That is the source; we are only an attentive reader of it.

The Régie du bâtiment du Québec page →

Why ours arrives already filled in

An empty template leaves you the longest part of the job: working out which obligations apply to your kitchen. We build them in advance, address by address, from the City of Montreal's open data.

Find my establishment's register →

The full building inspection register guide →

Data: City of Montréal · MAPAQ. Rules: Safety Code ch. VIII, NFPA, CAN/ULC. Rules verified on Aug 21, 2026. Regulatory journal

The operator remains solely legally responsible for the establishment's compliance. Tigidu is a record-keeping and coordination tool — not a contractor, an inspector, or legal advice.